Industrial command center

Model a deployment across sites and corridors.

Set up the sites you are planning, adjust modules, occupancy, distance and energy, and every indicator below recalculates immediately.

Planning estimates — not engineering calculationsLive telemetry — not connected

Scenario indicators

Sites in scenario
318 modules total
Floor area
540 m²94 people served
Peak power
172 kW1,290 kWh per day
Renewable share
71%Solar and storage contribution
Monthly fuel cost
$4,872At $1.40 per litre
Transport moves
9$3,597 indicative
Longest build
35 days70% standardized
Redeployable modules
530% reuse assumption

Programme assumptions

Sites in this scenario

Floor area
224 m²
Peak power
52 kW
Renewable
100%
Transport moves
4
Build time
33 days
Water / day
2,880 L
Floor area
112 m²
Peak power
42 kW
Renewable
74%
Transport moves
2
Build time
35 days
Water / day
1,440 L
Floor area
204 m²
Peak power
78 kW
Renewable
50%
Transport moves
3
Build time
32 days
Water / day
1,320 L

These figures are planning-level estimates based on your inputs and standard module data. Site conditions, loading, approvals and utilities are confirmed during engineering review.