- Floor area
- 224 m²
- Peak power
- 52 kW
- Renewable
- 100%
- Transport moves
- 4
- Build time
- 33 days
- Water / day
- 2,880 L
Industrial command center
Model a deployment across sites and corridors.
Set up the sites you are planning, adjust modules, occupancy, distance and energy, and every indicator below recalculates immediately.
Planning estimates — not engineering calculationsLive telemetry — not connected
Scenario indicators
- Sites in scenario
- 318 modules total
- Floor area
- 540 m²94 people served
- Peak power
- 172 kW1,290 kWh per day
- Renewable share
- 71%Solar and storage contribution
- Monthly fuel cost
- $4,872At $1.40 per litre
- Transport moves
- 9$3,597 indicative
- Longest build
- 35 days70% standardized
- Redeployable modules
- 530% reuse assumption
Programme assumptions
Sites in this scenario
- Floor area
- 112 m²
- Peak power
- 42 kW
- Renewable
- 74%
- Transport moves
- 2
- Build time
- 35 days
- Water / day
- 1,440 L
- Floor area
- 204 m²
- Peak power
- 78 kW
- Renewable
- 50%
- Transport moves
- 3
- Build time
- 32 days
- Water / day
- 1,320 L
These figures are planning-level estimates based on your inputs and standard module data. Site conditions, loading, approvals and utilities are confirmed during engineering review.